WarehubMX
← All buildings
SpecSaleUnder construction

Building M3 · Parque Industrial San Javier

Martel · Monterrey — Apodaca, Nuevo León

Specifications

▭
5,232.8
m² (56,325 sq ft) · Available area
↑
7.32
m (24 ft) · Clear height
⊡
4
docks · Dock doors
↗
2
ramps · Ramps
Total area
5,232.8 m² (56,325 sq ft)
Land
8,745.06 m² (94,131 sq ft)
Car parking
60

Description

Under construction. Minimum clear height of 24 ft (7.32 m) with 26.98 × 11.32 m bays. Dock-high loading docks. Utilities: overhead medium-voltage power (13,500 V), natural gas (Mexigas), potable water and industrial sewer (SADM). Construction: reinforced concrete pile foundation, steel structure (IPR columns, trusses and joists), 5" reinforced precast concrete walls, 5" fiber-reinforced concrete slab, KR-18 roof with 3" insulation and 5% skylights, aluminum windows on the perimeter wall. Two guard houses. Delivered in shell condition. The developer's floor plan shows it as two areas of 2,616.4 m² each.

Location

Parque Industrial San Javier · Monterrey — Apodaca, Nuevo León

View on Google Maps ↗
$113,680,000 MXN
sale price
+ VAT · Maintenance $1.30 MXN/m² of land + VAT
Available
5,232.8 m² (56,325 sq ft)
Delivery
Ask
Are you a broker? Download a branded spec sheet →
PDF with your name, brokerage and phone, ready to send to your client.

Contact the developer

No account needed. Your information is kept confidential.

By sending, you agree to our privacy notice.

M
Martel
via Warehub · Upd. 2026-10-02
$113,680,000 MXN
5,232.8 m² (56,325 sq ft) · Under construction
Contact